Month 1 foundation progress on the house and barn. Radiant in-floor heat and concrete slabs are on tap for the coming days. Swipe through the photos to go backwards in time:
1. Re-tamping after plumbing and electrical rough-in
2. Back filling trenches
3. Insulated and grouted house stem wall, doorway details
4. Barn stem wall, doorway details
5. Stem wall bond beam course
6. Laying 10″ block
7. Footer pour
8. Footer trenching and rebar